Projects
EGG is the owner of the rights to the following projects:
Cuadrejón I
99.95 MW
Located in the province of Cadiz, exactly in the town of Jédula, we have an excellent topographic conformation, without natural shadows nearby, with a 220kV HV Transport Line. Designed with battery storage. It will be the largest in Spain with this technology.
Cuadrejón II
61.28 MW
With a HV connection on a 220 kV transport line, this photovoltaic park is located in Arcos de la Frontera. Designed with a 21,07 MW storage system, it will be able to feed into the grid during peak demand hours.
Cuadrejón III
29.33 MW
Located in the province of Andalucia, with a 132kV HV Transport Line.